115 Yds - Mix 5004L - Column footings on building B - 6/29/21
120 Yds - Mix 5004L - Column footings on building C - 7/21/21
580 Yds - Mix6004L - Northside of the floor on Bldg B - 8/3/21
515 Yds - Mix 6004L - Southside of the floor on Bldg B - 8/10/21
2.5 Yds - Mix 6503A - Vault lids for pipework - 8/9/21
540 Yds - Mix6504L - Northside of the floor on Bldg C - 9/15/21
500 Yds - Mix6504L - Southside of the floor on Bldg C - 9/22/21
144 Yds - Mix 6003PS - Face side of West Panels on Bldg B - 10/20/21
180 Yds - Mix 6003PS - Face side of North & East Panels on Bldg B - 11/3/21
140 Yds - Mix 6003PS - Face side of South & East Panels on Bldg B - 11/5/21
150 Yds - Mix 260151 - Top side west panels Bldg B - 11/11/21
180 Yds - Mix 6003P - Top side west panels Bldg B - 11/15/21
150 Yds - Mix 6003P - Top side west panels Bldg B - 11/19/21
110 Yds - Mix 6003P - Top side east panels Bldg B - 11/24/21
70 Yds - Mix 6503P - Remaining Topside east panels Bldg B - 12/2/21
220 Yds - Mix 6003PS - Face side of West Panels on Bldg C - 12/6/21
100 Yds - Mix 6003PS - Face side of East Panels on Bldg C - 12/13/21
70 Yds - Mix 6003PS - Face side of East Panels on Bldg C - 12/14/21
166.5 Yds - Mix 6502L - Face side of North Panels & west panels on Bldg C - 12/21/21
100 Yds - Mix 5804L - Exterior west & north footings on building B - 12/30/21
140 Yds - Mix 7002L - Face side of south & west panels on Bldg C - 1/4/22
2 Yds - Mix 5504L - Kickers for pipework - 1/5/22
11 Yds - Mix 6502L - Shawcor Floor Replacement - 1/6/22
100 Yds - Mix 6502L - East panels Bldg C - 1/11/22
120 Yds - Mix 7002L - Face side of North & East panels on Bldg C - 1/13/22
130 Yds - Mix 5804L - Exterior east & south footings on building B - 1/14/22
51 Yds - Mix 6503P - Center panels Bldg C - 1/20/22
42 Yds - Mix 6003P - Center panels Bldg C - 1/25/22
100 Yds - Mix 5804L - Exterior east & south footings on building C - 1/31/22
100 Yds - Mix 5804L - Exterior west & north footings on building C - 2/9/22
16 Yds - Mix 7054L - Grout under panels Bldg C & B - 3/4/22
21 Yds - Mix 7054L - Grout under panels Bldg B - 3/7/22
10 Yds - Mix 7054L - Grout under panels Bldg C - 3/10/22
6 Yds - Mix 7054L - Grout under panels Bldg C - 3/11/22
50 Yds - Mix 5504L - Dock wall footings both buildings - 3/22/22
40 Yds - Mix 5504L - Dock wall footings both buildings - 3/24/22
20 Yds - Mix 5504L - Dock wall footings building B - 3/28/22
25 Yds - Mix 6003P - Dock walls bldg B - 3/28/22
30 Yds - Mix 6003P - Dock walls & footings bldg B & C - 3/31/22
68 Yds - Mix 6003P - Dock walls & footings bldg B - 4/6/22
7 Yds - Mix 5504L - Dock wall footings for dock levelers - 4/8/22
30 Yds - Mix 6003P - Remaning Dock walls - 4/11/22
5 Yds - Mix 7054L - Column bases building B - 4/13/22
2 Yds - Mix 5504L - Drain box collars - 4/21/22
8 Yds - Mix 5504L - Drain box collars - 5/2/22
30 Yds - Mix 6003P - Dock pit floors and walls bldg B - 5/10/22
10 Yds - Mix 6003P - Pour back East side & elec pad - 5/12/22
10 Yds - Mix 6003P - kickers & collars for storm drain box's & water lines - 5/18/22
10 Yds - Mix 7054L - Column bases building C - 5/19/22
40 Yds - Mix 7004L - Pourback East side Bldg B - 5/25/22
50 Yds - Mix 7004L - Pourback East side Bldg B - 5/26/22
50 Yds - Mix 7004L - Pourback West & North side Bldg B - 5/31/22
50 Yds - Mix 6502L - Pourback West & South side Bldg B - 6/2/22
16.5 Yds - Mix 6502L - Pourback South side Bldg B & doorway Bldg C- 6/3/22
16 Yds - Mix 6504L - Dock pit floors Bldg C- 6/8/22
16.5 Yds - Mix 6502L - Pourback north & east side Bldg C- 6/3/22
16 Yds - Mix 6504L - dock pit floors Bldg C- 6/8/22
32 Yds - Mix 6502L - Pourback East side Bldg C- 6/9/22
32 Yds - Mix 6502L - Pourback West side Bldg C- 6/13/22
10 Yds - Mix 6503A - Water line kickers, bollards Bldg C- 6/14/22
54 Yds - Mix 6504LS - Pourback West side Bldg C- 6/15/22
50 Yds - Mix 6504LS - Pourback West side Bldg C- 6/21/22
40 Yds - Mix 6504LS - Pourback West side Bldg C- 6/22/22
10 Yds - Mix 5504L - Dock Bollards & Interior footings Bldg C- 6/29/22
18.5 Yds - Mix 6003P - Dumpster enclosure walls & footings Bldg C- 7/12/22
5.5 Yds - Mix 6504L - Bollards & Electrical Pad Bldg C- 7/14/22
10 Yds - Mix 6504L - Dumpster enclosure walls Bldg C- 7/18/22
12 Yds - Mix 6504LS - Drains & Column floor Bldg C- 7/21/22
4 Yds - Mix 5504L - Dumpster Gate Post's - 8/1/22
2 Yds - Mix 5504L - Bollards & Drains - 8/3/22
14 Yds - Mix 6504L - Floor replacement for underground Bldg C T.I. - 8/4/22 Fincon
170 Yds - Mix 6503A - Dock Ramps South side - 8/9/22
172 Yds - Mix 6503A - Dock Ramps South side - 8/11/22
120 Yds - Mix 6503A - Dock Ramps - 8/18/22
110 Yds - Mix 6503A - Dock Ramps - 8/22/22
110 Yds - Mix 6503A - Dock Ramps - 8/23/22
110 Yds - Mix 6503A - Dock Ramps - 8/24/22
110 Yds - Mix 6503A - Dock Ramps - 8/25/22
25 Yds - Mix 5504L - East retaining wall footings - 8/25/22
110 Yds - Mix 6503A - Dock Ramps - 8/29/22
26 Yds - Mix 6003P - East retaining wall - 9/6/22
47 Yds - Mix 6503A - Dock Water Way - 9/12/22
117 Yds - Mix A6545A - Curb & Gutter - 9/16/22
117 Yds - Mix A6545A - Curb & Gutter - 9/198/22
10 Yds - Mix 6503A - Curb & Gutter - 9/19/22
617.5 Yds - Mix 6503A - Dock Drive Paving - 9/21/22
15 Yds - Mix 6505A - Curb & Gutter - 9/22/22
15 Yds - Mix 6505A - Curb & Gutter - 9/23/22
10 Yds - Mix 6503A - Building B buildout Ftgs & Trench - 9/26/22
15 Yds - Mix 6505A - Curb & Gutter - 9/26/22
10 Yds - Mix 6505A - Curb & Gutter - 9/27/22
29 Yds - Mix 6505A - Curb & Gutter - East Waterway - 9/28/22
140 Yds - Mix 6503A - West Approach - 9/29/22
5.5 Yds - Mix 6505A - Curb & Gutter - 9/29/22